Western Energy and Ventures Pvt. Ltd.

Hydropower · Renewable Energy · Nepal

Powering Nepal’s Future Through Clean Energy

Western Energy and Ventures Pvt. Ltd. is developing sustainable hydropower infrastructure with a focus on long-term energy generation, responsible development and value creation.

0 MW

Installed Capacity

Planning figure

NPR 0 Cr

Planned Project Cost

NPR 0 Cr

Planned Equity Requirement

June 0

Target COD

Planning figure

Source: Obregad Hydropower Project Investor Booklet. Figures are project planning figures and may change following detailed studies, approvals, financing arrangements and definitive agreements.

About Us

Building Long-Term Value Through Clean Energy

Western Energy and Ventures Pvt. Ltd. is a Nepal-based energy venture focused on the development of hydropower infrastructure.

The company is engaged in responsible project development — from surveying and studies through construction and commissioning — with a focus on sustainable energy generation, transparency and long-term value for stakeholders.

Hydropower Development

Developing run-of-river hydropower projects from survey through construction and commissioning.

Renewable Energy

Building clean-energy generation assets that contribute to Nepal's national electricity supply.

Infrastructure

Managing the civil, mechanical and electrical infrastructure required for reliable energy delivery.

Responsible Development

Conducting development activities responsibly, with attention to environmental and community factors.

Our Project

Obregad Hydropower Project

9 MW Run-of-River Hydropower Project. Located at Obregad Khola, Patrasi Rural Municipality, Jumla District, Karnali Province, Nepal.

The Obregad Hydropower Project is a planned 9 MW run-of-river hydropower project on the Obregad Khola in Patrasi Rural Municipality, Jumla District, Karnali Province, Nepal. It is being developed by Western Energy and Ventures Pvt. Ltd.

Run-of-river projects generate electricity from the natural flow of a river without large-scale water storage. Clean water is diverted through an intake, conveyed through a headrace system and returned to the river after passing through the generating units.

Key Project Facts

Location
Obregad Khola, Patrasi, Jumla, Karnali, Nepal
Installed Capacity
9 MW
Project Type
Run-of-River
Design Discharge
13.46 m³/s
Planning Net Head
78.03 m
Annual Saleable Energy
51.96 GWh
Transmission
Approx. 8 km, 33 kV
Target COD
June 2030
Total Project Cost
NPR 190 crore
Debt
NPR 133 crore
Equity
NPR 57 crore

Project Highlights

A Focused, Well-Planned Development

Key characteristics of the Obregad Hydropower Project based on the current planning case.

9 MW Installed Capacity

Two generating units of approximately 4.5 MW each for the planned configuration.

51.96 GWh Annual Saleable Energy

51.96 GWh of annual saleable energy on the current planning basis.

Run-of-River Design

A run-of-river scheme that returns water to the river after generation.

33 kV Evacuation

Approximately 8 km of 33 kV evacuation to the interconnection point.

Figures shown are based on the current project planning case and may change following detailed studies, approvals, financing and definitive agreements.

Technical Configuration

Engineering at a Glance

Technical parameters on the current planning basis. Detailed dimensions will be finalized through the DPR and procurement.

Generating Units

2 × approximately 4.5 MW

Turbine

Francis configuration

Final selection through DPR

Gross Head

Approximately 88 m

Net Head

78.03 m

Planning basis

Design Discharge

13.46 m³/s

Annual Saleable Energy

51.96 GWh

Planning basis

Evacuation Voltage

33 kV

Evacuation Length

Approximately 8 km

Detailed hydraulic, civil and equipment dimensions will be finalized through the Detailed Project Report (DPR) and the procurement process. Values above are the current planning basis.

View Full Technical Details

Development Roadmap

From Survey Licence to Commissioning

The project's planned stages and their current status. Colour-coded by stage.

The survey licence for the project has been obtained. Detailed studies, approvals, financing and construction remain ahead, with a target commercial operation date (COD) of June 2030.

Obtained
In Development
Planned / Target
Pending
  1. 01Survey Licence

    Obtained

    Survey licence stage for the project's investigation and study works.

  2. 02DPR & Detailed Studies

    In Development

    Detailed Project Report, geological, hydrological and engineering studies.

    Development-stage priority

  3. 03PPA with NEA

    Target

    Power Purchase Agreement with Nepal Electricity Authority.

    Targeted in project plan

  4. 04Generation Licence

    Pending Approval

    Generation licence from the relevant regulator following required studies and approvals.

    Following required studies and approvals

  5. 05Financial Close

    Planned

    Senior debt, equity completion and lender appraisal.

    After PPA, DPR, lender appraisal and equity completion

  6. 06Construction & Commissioning

    Target

    Civil works, electromechanical installation and commissioning.

    Target COD June 2030

Sustainability

Clean Energy, Responsible Development

Our approach to sustainability across the project lifecycle.

Clean Energy

Hydropower generates electricity from renewable water resources.

Environmental Responsibility

Environmental studies, responsible development and regulatory compliance are priorities.

Local Community

Responsible engagement and community programs throughout development.

Long-Term Infrastructure

Intended contribution to Nepal's long-term electricity infrastructure.

Investment Structure

Planned Capital Structure

Total project cost of NPR 190 crore, structured 70:30 between senior debt and equity on the current planning case.

70:30Debt : Equity
  • Senior Debt Target70% · NPR 133 crore
  • Total Equity30% · NPR 57 crore
  • Founder Equity Planning AllocationNPR 25 crore
  • Investor / Private Placement Planning AllocationNPR 32 crore
Financial projections are subject to detailed studies, approvals, financing arrangements, definitive agreements and actual project performance. This is a modelled planning case, not a guarantee of return.
Dipesh Ghimire, Chairman, Kashyap Capital Holdings

Strategic Partnership

Kashyap Advisors · Kashyap Capital Holdings

Dipesh Ghimire, Chairman, Kashyap Capital Holdings — NPR 15 crore intended investor in the Obregad Hydropower Project.

Financial Profile

Modelled Planning-Case Returns

Internal rate of return figures from the current financial model.

Financial projections are subject to detailed studies, approvals, financing arrangements, definitive agreements and actual project performance. These are modelled planning-case figures, not guarantees of return.

Modelled Project IRR

~18.4%

Internal rate of return on the project cash flows.

Modelled Planning Case

Modelled Equity IRR

~24.7%

Internal rate of return on equity cash flows.

Modelled Planning Case

News & Updates

Latest News & Project Updates

Partnering in Nepal’s Energy Future

Explore participation in the equity of the Obregad Hydropower Project. Submissions are expressions of interest only and do not create any agreement.

Have a question about the project?

Our team is happy to answer questions from investors, partners, contractors, communities and other stakeholders. Contact details are provided once finalized by the company.

Contact Us