Project Technicals
Technical Configuration
Engineering parameters of the Obregad Hydropower Project on the current planning basis.
Planning Basis
Technical Parameters
Detailed hydraulic, civil and equipment dimensions will be finalized through the Detailed Project Report (DPR) and the procurement process.
Generating Units
2 × approximately 4.5 MW
Turbine
Francis configuration
Final selection through DPR
Gross Head
Approximately 88 m
Net Head
78.03 m
Planning basis
Design Discharge
13.46 m³/s
Annual Saleable Energy
51.96 GWh
Planning basis
Evacuation Voltage
33 kV
Evacuation Length
Approximately 8 km
Key Project Facts
Planning / Development Stage- Generating Units
- 2 × approximately 4.5 MW
- Turbine
- Francis configuration — final selection through DPR
- Gross Head
- Approximately 88 m
- Net Head (Planning)
- 78.03 m planning basis
- Design Discharge
- 13.46 m³/s
- Annual Saleable Energy
- 51.96 GWh planning basis
- Evacuation Voltage
- 33 kV
- Evacuation Length
- Approximately 8 km
Run-of-River Principle
A run-of-river scheme generates electricity from the natural flow of the river. Water is captured at an intake, conveyed to the powerhouse through the waterway system, and returned to the river downstream after passing through the turbine — without large-scale storage.