Western Energy and Ventures Pvt. Ltd.

Our Project

Obregad Hydropower Project

9 MW Run-of-River Hydropower Project · Obregad Khola, Patrasi Rural Municipality, Jumla District, Karnali Province, Nepal

Project Overview

A Clean-Energy Development on the Obregad Khola

The Obregad Hydropower Project is a planned 9 MW run-of-river hydropower project on the Obregad Khola in Patrasi Rural Municipality, Jumla District, Karnali Province, Nepal. It is being developed by Western Energy and Ventures Pvt. Ltd.

Run-of-river projects generate electricity from the natural flow of a river without large-scale water storage. Clean water is diverted through an intake, conveyed through a headrace system and returned to the river after passing through the generating units.

The figures shown on this website reflect the current project planning case and will be finalized through the Detailed Project Report (DPR), detailed engineering studies, the survey licence stage, regulatory approvals, procurement and definitive agreements.

9 MW Installed

Two generating units of approximately 4.5 MW each.

Run-of-River

Water returned to the river after generation.

9 MW · Run-of-River
Obregad Hydropower Project site

Obregad Hydropower Project

Obregad Khola · Jumla, Karnali Province, Nepal

Key Project Facts

Planning / Development Stage
Location
Obregad Khola, Patrasi, Jumla, Karnali, Nepal
Installed Capacity
9 MW
Project Type
Run-of-River
Design Discharge
13.46 m³/s
Planning Net Head
78.03 m
Annual Saleable Energy
51.96 GWh
Transmission
Approx. 8 km, 33 kV
Target COD
June 2030
Total Project Cost
NPR 190 crore
Debt
NPR 133 crore
Equity
NPR 57 crore

Project Highlights

Key Characteristics

9 MW Installed Capacity

Two generating units of approximately 4.5 MW each for the planned configuration.

51.96 GWh Annual Saleable Energy

51.96 GWh of annual saleable energy on the current planning basis.

Run-of-River Design

A run-of-river scheme that returns water to the river after generation.

33 kV Evacuation

Approximately 8 km of 33 kV evacuation to the interconnection point.

Detailed hydraulic, civil and equipment dimensions will be finalized through the Detailed Project Report (DPR) and the procurement process. Values above are the current planning basis.

Explore Further

Project Information

Dive deeper into the project's location, technical configuration and development status.

Location

Obregad Khola, Patrasi Rural Municipality, Jumla District, Karnali Province, Nepal

View Location

Technical Configuration

Engineering parameters on the current planning basis.

View Technical Details

Development Status

Progress from survey licence to target COD of June 2030.

View Development Status

Technical Configuration

Engineering at a Glance

Generating Units

2 × approximately 4.5 MW

Turbine

Francis configuration

Final selection through DPR

Gross Head

Approximately 88 m

Net Head

78.03 m

Planning basis

Design Discharge

13.46 m³/s

Annual Saleable Energy

51.96 GWh

Planning basis

Evacuation Voltage

33 kV

Evacuation Length

Approximately 8 km

Development Roadmap

Planned Development Stages

  1. 01Survey Licence

    Obtained

    Survey licence stage for the project's investigation and study works.

  2. 02DPR & Detailed Studies

    In Development

    Detailed Project Report, geological, hydrological and engineering studies.

    Development-stage priority

  3. 03PPA with NEA

    Target

    Power Purchase Agreement with Nepal Electricity Authority.

    Targeted in project plan

  4. 04Generation Licence

    Pending Approval

    Generation licence from the relevant regulator following required studies and approvals.

    Following required studies and approvals

  5. 05Financial Close

    Planned

    Senior debt, equity completion and lender appraisal.

    After PPA, DPR, lender appraisal and equity completion

  6. 06Construction & Commissioning

    Target

    Civil works, electromechanical installation and commissioning.